Minutes of the Meeting with PJCA Members held on
02/08/2013 under the chairmanship of Member (P) to discuss one of the issues
viz., postmen committee recommendations.
After deliberations following agreements were arrived at:-
Sl. No.
|
Agenda Item
|
Decisions taken
|
1.
|
Postmen Committee Recommendation not
Implemented
|
|
(a)
|
Extraction of data entry work from Postman:Suitable
instructions / Orders to all the Circles are to be issued by 30/04/2012;
nothing has been done so far. An early issue of orders is required to
implement them.
|
Heads of Circles have been requested to impart
training to the postmen who are unable to perform data entry work on
computers. It has been agreed to accord time factor for data entry work
using same norms presently used for calculating work- load of Postal
Assistant, in case work is being done by postman.
|
(b)
|
Revision of postmen norms: Postmen norms issued by the Department are
very old. The decision taken in the committee are not convincing.
As such it is suggested that formation of fresh Internal Work Study Unit with
one / two staff side members to review all work performed by postmen staff
with door to door measurement of beats was requested. Internal Work
Study Unit for this job is to be ordered by the Directorate as the same does
not come under the jurisdiction of the Committee.
|
The norms were formulated after intensive
scientific work study by the IWSU of the Department in 2008. Since five
years have already elapsed, a study by departmental officials or by a
third party may be conducted to review the postmen’s norms keeping in view
that IWS Unit no longer exists.
|
(c)
|
Change in procedure for payment of Speed
Post delivery incentive: At present the procedure for payment of incentive is very
lengthy. Nobody prepares bills. In case the bills are prepared
they remain under verification of PRI/SDI/ASP then go to sanction to the
Divisional Head. After sanction of bills from Divisional Head to DDOs
for payment. Then bills are to be prepared DDOs for payment
office wise. It is suggested that module for payment of Speed Post
Incentive in the computer software be installed and give powers of payment to
the concerned postmaster on weekly/ monthly. After payment the
concerned vouchers be sent to the DDOs for accounting purpose.
|
The software for generation of Postman
incentive bills is being developed by the CSI partner under the IT Project.
Meanwhile it has
been decided to issue instructions to all circles that incentive bills may be
cleared on monthly basis till the software is developed.
|
(d)
|
Combination of beat: It was decided in
the above meeting that limit of combination of beat in the post office having
4+ strength will be removed since it adversely affects the delivery
efficiency. But orders on this item are yet to be issued by the
Directorate. This needs to be done at the earliest.
|
Staff side was informed that orders have
already been issued in this regard. A photocopy of the order
No.10-7/2001-P.E.II dated 02/09/2006 is enclosed for needful.
|
(e)
|
Delivery of Heavy parcels and EPP articles: It was pointed out by the staff side that
Postman faces difficulty in delivery of registered parcels weighing more than
5 Kgs each and EPP articles of which the maximum weight of 35 Kgms., per
articles has been fixed. It was highlighted that either some reasonable
rate and mode of conveyance for delivery EPP articles should be fixed or the
rates of coolie charges fixed in the past should be revised for efficient
delivery of the registered parcel. It was decided that the Directorate
will consider reiterating the instructions on coolie charges to all the
Circles so that the delivery of heavy parcels is not adversely
affected. Whether coolie charges pertaining to heavy parcels have been
enhances due to high prices. As regards EPP parcels, whether mode of conveyance
with rate of each mode have been decided by the Directorate.
|
Staff side was informed that New Parcel
Division is examining this issue. The proposal to revise the coolie
charges will also be examined by the Parcel Division.
|
(f)
|
Corrigendum on density of population: The staff side drew attention of the
committee to the note of Sl.8 in the Directorate letter No.9-1/2005-WSI/PE.I
dated 05/02/2010 which stipulates that area having a density of population
2500 per Sq. KM may be taken as congested area “and pointed out that the same
has incorrectly been printed as it should refer to 2500 per sq. Mile instead
of 2500 per sq. kilometer. They quoted a clarification received from
PTC, Mytore which has cited Directorate letter dated 19/02/1976 indicating
establishment norms for Postmen and defining congested area or having a
density of population of 2500 sq. per Mile. After discussion it was
agreed that Directorate would examine and issue suitable amendment /
corrigendum to the Note 8 of the revised norms of postmen establishment.
|
The staff side was informed that there
is no typographical error. The definition of the congested area as 2500
per square kms. is correct.
|
(g)
|
Creating of justified additional posts: In this connection while implementing
the system for delivery work and allowing postmen to write correct remarks
for non-delivery. The staff side drew attention to item No. 25 minutes
of the last JCM meeting issued on 01/03/2012 wherein it is mentioned that the
issue is under examination by the Postman Committee being chaired by CGM
(PLI). After discussion, the view emerged that this item is not part of
Committee’s mandate and the issue pertains to creation / re-deployment of
Posts which is basically a policy issue. However, the staff side
mentioned that Postmen were not able to write correct remarks for
non-delivery of article due to heavy work in the project Arrow Offices, it
was, therefore, decided that the experience gathered after implementation of Project
Arrow in various Post Offices could be examined. Result on examination
has not been communicated so far in this regard.
|
Circles have been requested to review the Post
Office Establishments. On receipt of reports from all the Circles, the
justification, if any, of the additional posts will be examined in
consultation with Ministry of Finance.
|
2.
|
Cadre Restructuring of Postman an MTS: The first and foremost issue on which a bias
against the Postman is clearly visible is that of cadre restructuring for
this cadre. The Department through conceded to form a Cadre
Restructuring Committee during the strike negotiations with the Postal Joint
Council of Action had issued orders omitting the cadre of Postman and MTS
from the ambit of cadre restructuring. This shows the mind-set of the
Department on the important issue of cadre restructuring of Postman and MTS
cadre. The stand of the Postal Directorate was against the direction of
the Official Side in the National Anomaly Committee that every department
shall go into the issue of cadre restructuring for boosting the promotional
avenues of employees rather than depending too much on the MACP Scheme for
that purpose. It is a known fact that the cadres of Postman and MTS
have no in-situ promotion in their cadre except the promotion to the cadre of
Postal Assistant through a competitive examination. Every other cadre
other than the cadres of Postman and MTS have their own hierarchical
promotions in their own cadre and this discrimination cannot be ended without
a proper cadre restructuring in place for the Postman and MTS cadre.
Even the flimsy promotion for the cadre of Postman earlier to the
introduction of TBOP / BCR like Head Postman, sorting Postman etc., have
disappeared from the scene and as on date no promotion in the cadre is
available to both these cadres. Unfortunately, the Department of Posts
not only not in a position to appreciate our contention as well as the
proposal for cadre restructuring based on percentage basis as available to
all cadres in the Department of Railways but no inclined to consider any
cadre restructuring proposal to these cadres. The absence of any
promotion to them in their own cadre leaves them total frustrated and takes
away any incentive to perform better to the services. This has to be
properly appreciated and attended to by the Postal Directorate in the absence
of Cadre Restructuring Committee failed to find out any alternate proposals
to ‘our proposal based on percentage.’
|
Cadre Restructuring Committee headed by the
then DDG (P), Shri Salim Haque had been given this mandate and issue will be
decided after finalization of the Committee report.
|
3. (A)
|
Door to Door Scientific Measurement of
Beats: (A) – At
present the door to door beat measurement system adopted by the department is
not only unsatisfactory but also incorrect one as neither scientific device
like foot meter nor cyclo meter is used to assess the actual length of
beat. The measurement of beats is generally done while sitting on the
table by guess work only. Moreover the workload of mail delivery and
number of houses to be visited during duty of eight hours has no where been
laid down causing extreme harassment to postmen staff. It
is demanded that the number of houses to be visited and number of articles to
be delivered should be laid down in the interest of delivery efficiency and
rationalization of workload of postmen staff as well.
The Directorate ordered for rationalizing of
Postman beats after hearing our complaints that Postman beats are constructed
unscientifically with long distances humanly impossible to cover on a
day. Many examples like more than 70 kilometers beats were brought to
the notice of the Postman Committee to substantiate our complaints.
Based on the discussions the Directorate agreed to issue orders for measuring
the beats and rationalizing them appropriately. Unfortunately the CHQs
of our Unions are receiving complaints from our Circles that re-measuring of
beats is being done most unscientifically without using either the
cyclo-meters or foot-meters but applying their imaginary calculations.
This has complicated the problem more and there is wide spread resentment
among the Postman staff. Both our unions urge upon you to issue strict
instructions to measure all Postman beats only by using cyclo-meters or
foot-meters for the purpose of rationalizing the beats.
|
Same as 1 (b) above.
|
(B)
|
To fix the meeting of Committee for
Modification in Order No. 31-38/79-PE-I dt. 22-5-1979:- The Committee Constituted for examination of
Modification in Departmental Order No. 31-38/79-PE-I dt. 23-5-1979 in R/O
footwork of the Postman from door to door walk in R/O Item DO 4 of Periodical
Meeting held on 29-11-2012 and Departmental Council Meeting on 28-12-2012.
|
As in 1 (b) above.
|
4. (A)
(B)
|
Revision of Syllabus to Departmental
Examinations
Request to conduct special examination for
recruitment to the Postman & MTS cadres for the years 2009, 2010, 2011
and 2012 : To avoid recurring vacancies due to leaving of qualified employees
of high standard in
the background of submission made above, it is requested that –
1. To fill up the vacancies for the years
2009 to 2013 in the Postman and MTS cadre aspecial examination only for
GDS/MTS employees may
be conducted.
2. The question paper may be set on the basis of practical and relevant work
routinely done by the regular
MTS and Postman employees.
3. The work of setting question paper may be got done by a promotee officerwho is having practical
knowledge of the nature of work being done by the MTS and Postman employees.
|
A committee has been constituted under
chairmanship of DDG (R&P) to examine the contents of question papers set
by various circles with reference to syllabus prescribed and submit a
detailed report.
.
|
(C)
|
Filling up vacant posts with Residual
vacancies:- All
vacant post of Postmen & Group D/MTS should be filled in within 30th June 2013 as directed by Directorate. There
is no chance to fill up vacant posts in due time as no notification has been
issued in many circles like A.P. and Assam Circle etc.
|
Necessary action has been initiated in
circles. It was decided that the orders to fill up the vacant posts
will be reiterated to the circles.
|
5.
|
Improving the Quality of Uniforms and timely
supply of all kit items:-The Postman and MTS are called the uniformed staff
in the Department of Posts. Unfortunately these cadres who are actually
moving among the members of public pose a poor picture to the image of the
Department because of the inferior quality of the uniform cloth. Despite the
agreement with the All India Unions by the Department that facilitated
inclusion of staff side member from the Unions in the purchase committee of
uniform cloth to ensure purchase of better quality of cloth,, the problem
persists. This cannot be sorted out unless the cost price permitted by the
DOPT is enhanced on the face of escalating prices of all commodities
including the textiles. The cost price permitted by the DOPT cannot ensure
better quality uniform cloth from the market. Added to this are the
violations here and there in Circles where the Administration is not
sincerely ensuring inclusion of staff side members in the purchase committee
and no protection against ensuring supply of the selected quality of cloth
only to the staff. These have to be addressed immediately.
|
This item will be discussed in the JCM
Standing Committee meeting to be held on 23/08/2013.
|
6.
|
Stop Unscientific Measurement of Postmen
Beats:
The Directorate ordered for rationalizing of
Postman beats after hearing our complaints that Postman beats are constructed
unscientifically with long distances humanly impossible to cover on a day.
Many examples like more than 70 Kilometres beats were brought to the notice
of the Postman Committee to substantiate our complaints. Based on the
discussions the Directorate agreed to issue orders for measuring the beats
and rationalizing them appropriately. Unfortunately the CHQs of our Unions
are receiving complaints from our Circles that re-measuring of beats is being
done most unscientifically without using either the cyclo-meters or
foot-meters but applying their imaginary calculations. This has complicated
the problem more and there is widespread resentment among the Postman staff.
Both our Unions urge upon you to issue strict instructions to measure all
Postman beats only by using cyclo-meters or foot-meters for the purpose of
rationalizing the beats.
|
Same as 1 (b) above.
|
7.
|
Cycle Maintenance Allowance to MTS:-The
Cycle Maintenance Allowance is paid to all Postman staff without any
conditions whereas the MTS Staff who are engaged in letter box clearing or
other outside office work excluded from the ambit of CMA. This is
unjustified. The MTS Staff also are to be paid CMA without any conditions as
like Postman staff. Both our Unions urge upon you to issue necessary orders
to pay CMA to all MTS without any conditions.
|
The Postman’s duty involves daily visit to
deliver letters in his beat and hence if he is using cycle the
allowance is admissible. Since different persons, depending on
availability of persons, are used for letter box clearances, the allowance
cannot be given to any specific official. Further, in many Post Offices
one or two bicycles are generally kept. That can be used for clearing
Letter Boxes. The proposal that MTS staff be paid CMA without any condition
like Postman staff is thus not acceptable.
|
(a)
|
Revision of Fixed Monetary Compensation
(FMC):-This has reference to your office letter No 10-7/2003.P.E.II
dated 24th Nov 2010 whereinexisting rate on
revision has been enhanced for each category except Multi Tasking staff whose rate of
remuneration has been reduced @ Rs 60/- per holiday for 4 hours whereas
MTS staff was getting @ Rs63.45 per holiday for 3 hrs on hourly basis @ Rs 21.15 per
hour. Protracted correspondence made proved in fructuous. This need to be
reviewed for proper justice to the MTS staff.
|
The staff side was informed that the matter is
under examination in consultation with IFW.
|
8.
|
Abolition of Nodal Delivery Centers at all
metro cities:-All Nodal delivery centers should be abolished throughout the
Country immediately to avoid complication in day-to-day delivery system.
(Example–West Bengal Circle, Karnataka Circle, Bangalore, Maharashtra Circle
Mumbai GPO).
|
The staff side was asked to furnish the
specific cases with details of the complications due to creation of Nodal
Delivery Centres. Department’s view is that Nodal Delivery is
functioning smoothly in such centres.
|
9.
|
To Stop harassment:-The postman staff being
tortured for 100% delivery and in various cases by asking them to work beyond
duty hours and many other ways harassment is there it must be stopped.
|
Staff side was asked to furnish specific cases
so that this could be taken up with respective circles.
|
10.
|
Promotional posts of Postmen Cadre: The
posts of Mail Overseer, Cash Overseer, Head Postman and Sorting Postman
should be considered as promotional posts for Postmen cadre and an additional
increment or some allowance should be granted for performance duties on such
posts. Seniority criteria of postmen should be taken in view while deploying
on these posts.
|
This item will be discussed in a meeting
decided to be held under the
chairmanship
of
Member (P).
|
(ARun Malik)
Director (SR & Legal)
BETTER LATE, THAN NEVER!!
AT LAST DEPARTMENT OF POSTS AND MINISTRY OF COMMUNICATIONS ADMITTED THAT McKENSEY
MODEL (MNOP) L1, L2
MODEL (MNOP) L1, L2
IS A TOTAL FAILURE
ORDERS ISSUED TO RESTORE THE OLD POSITION
NAME REMAINS (L1, L2) BUT THE SCHEME STANDS SCRAPED
THE STAND TAKEN BY THE JCA (NFPE & FNPO)
FROM THE VERY BEGINNING HAS BEEN PROVED RIGHT.
IT IS A VICTORY FOR OUR CONTINUOUS CAMPAIGN AND STRUGGLES INCLUDING THE DECISION FOR INDEFINITE STRIKE WHICH COMPELLED THE DEPARTMENT TO GIVE AN ASSURANCE THAT NO RMS OFFICES WILL BE CLOSED.